Resource Type

Journal Article 2912

Conference Videos 149

Conference Topics 2

Year

2024 5

2023 213

2022 260

2021 259

2020 190

2019 171

2018 163

2017 162

2016 118

2015 137

2014 108

2013 103

2012 113

2011 98

2010 143

2009 150

2008 103

2007 116

2006 75

2005 57

open ︾

Keywords

suspension bridge 19

system 17

high-quality development 16

interaction 16

model test 15

optimization 15

bridge 14

China 11

cable-stayed bridge 10

different 10

index system 10

innovation 10

Artificial intelligence 9

development 9

simulation 9

system engineering 9

Multi-agent system 8

durability 8

engineering management 8

open ︾

Search scope:

排序: Display mode:

The key technology of testing and commissioning of high-speed railway and the main testing achievements

Kang Xiong and Yao Jianwei

Strategic Study of CAE 2015, Volume 17, Issue 4,   Pages 21-29

Abstract:

The connotation and necessity of testing and commissioning of high-speed railway is explained andof testing and commissioning of high-speed railway are analyzed from the perspective of wheel/rail interactionpantograph and ocs relationaerodynamics of high-speed railway and train-track-bridge coupling.Then the main achievements of testing and commissioning of high-speed railway in China are concluded,and some useful suggestions are given about high-speed railway construction and operation.

Keywords: high-speed railwaysystem testtesting and commissioningwheel/rail interactionpantograph and ocsrelationtrain-track-bridgeaerodynamics of high-speed railway    

Development of research on aerodynamics of high-speed rails in China

Tian Hongqi

Strategic Study of CAE 2015, Volume 17, Issue 4,   Pages 30-29

Abstract: of high-speed rails in China, which focuses on train aerodynamics, vehicle-track-bridge-tunnel couplingaerodynamics, vehicle-wind-sand-rain-snow environmental aerodynamicspantograph-catenary aerodynamicand body aerodynamics.breakthrough, proposing measures to tackle aero dynamical problems which pose a threat to development of high-speedThe paper introduces a series of experimental platforms for testing aerodynamics of high-speed rails

Keywords: rail aerodynamicshigh-speed rails; experimental platforms; research development; train aerodynamicstrain/tunnel coupling aerodynamicstrain/wind coupling aerodynamicspantograph-catenary aerodynamics; human aerodynamics    

High-speed train bogie technology research of coupled systems in high-speed trains

Zhao Minghua,Liang Shulin and Song Chunyuan

Strategic Study of CAE 2015, Volume 17, Issue 4,   Pages 53-62

Abstract:

High-speed railway propose higher requirements on the bogie technology,in order to design a supertread analysis the matching relationship of wheel and rail.line conditions on the ballastless track of China,setup China high-speed train load spectrum.Through system integration of the structure design,suspension,transmission,brake,wheel rail noise,structurewelding and so on,the high-speed train bogie technology system was founded.

Keywords: high-speed trainwheel/rail relationship;system dyanmics;load spectrum;structural optimization    

Model test of the group piles foundation of a high-speed railway bridge in mined-out area

Xin LIANG,Qian-gong CHENG,Jiu-jiang WU,Jian-ming CHEN

Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 4,   Pages 488-498 doi: 10.1007/s11709-016-0338-x

Abstract: The research on the mechanism of pile-soil-cap-goaf interaction and settlement of high-speed railwaybridge located in mined-out area is still relatively rare.By taking the pile group of Guanshandi bridge foundation in Hefei-Fuzhou high-speed railway as the prototype, a model test is carried out.addition, the formula for calculating bearing capacity and settlement of pile group in goaf based on test

Keywords: high-speed railway     mined-out areas     goaf     group piles foundation     physical model test     bearing capacity     settlement    

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Engineering 2017, Volume 3, Issue 1,   Pages 150-150 doi: 10.1016/J.ENG.2017.01.002

Wheel/Rail Approach is the Inevitable Choice for Beijing - Shanghai High Speed Railway——Analysis of the

Jin Lüzhong

Strategic Study of CAE 2000, Volume 2, Issue 7,   Pages 22-27

Abstract: High Speed Railway is feasible./rail type high speed trains and great efforts should be paid to development of maglev trains.speed highway network and the wheel/rail type high speed railway network are already available, andrailways in terms of technology and economy except that its speed is higher than wheel/rail type railwaysIt is essential to approve the wheel/rail type Beijing - Shanghai High Speed Railway at an early date

Keywords: high speed railway     technical and economical comparison     wheel/rail type railways     maglev    

Study on dynamics of coupled systems in high-speed trains

Zhang Weihua

Strategic Study of CAE 2015, Volume 17, Issue 4,   Pages 42-52

Abstract:

According to the structure and technical features of high-speed railway, the high-speed trainrailon the dynamic behavior of the high-speed train are coupled as a unified system.of high-speed trainrail line, pantograph-catenary and power supply and the coupled interaction modelsof wheel-railpantograph-catenary, liquid-solid and electro-mechanical.[Key words] high-speed train; service performance; train detection; tracking test; performance evolution

Keywords: high-speed train; service performance; train detection; tracking test; performance evolution    

200 km Per Hour一The Best Choice for Beijing - Shanghai Express Railway

Li Yushan

Strategic Study of CAE 2004, Volume 6, Issue 12,   Pages 7-12

Abstract: from China's actual conditions, holds that in the construction of Beijing — Shanghai express railwayThe paper maintains that the electrified fast-speed wheel/rail system with a speed of 200 km per hourshould be the best choice for China*s railway development.In the time with increasing energy crisis, the maglev train with speed of 400 km per hour and the high-speedrail system with speed of 300 km per hour will lead to the unbearable wastes of socio-economic resources

Keywords: Beijing - Shanghai express railway     optimal choice     maglev     high-speed rail system     fast-speed rail system    

The Construction of Beijing - Shanghai High Speed Railway

Shen Zhiyun,Qian Qingquan

Strategic Study of CAE 2000, Volume 2, Issue 7,   Pages 28-33

Abstract:

This paper introduces the Maglev technology and High Speed Wheel-rail technology systematically withrespect to the establishment of Beijing - Shanghai High Speed Railway, compares the advantages and disadvantagespurpose of this paper is to present some valuable references to the construction of Beijing - Shanghai HighSpeed Railway.

Keywords: construction of Beijing - Shanghai high speed railway     maglev technology     high speed wheel-rail technology    

Bridge engineering construction and technical innovation in the section between Beijing and Cangzhouin Beijing-Shanghai high-speed railway

Du Jiajun

Strategic Study of CAE 2009, Volume 11, Issue 1,   Pages 22-25

Abstract: According to the features of bridges in the section between Beijing and Cangzhou in Beijing-Shanghai high-speedrailway, the construction and technical innovations which include special representative structure ofsettlement after the completion of bridges in the regional land subsidence area and assurance methods on hightrack regularity of ballastless track in 350 km/h speed are mainly introduced.

Keywords: high-speed railway     bridge engineering     construction     technical innovation    

Interactive effects of high-speed rail on nodal zones in a city: exploratory study on China

Guo LIU, Kunhui YE

Frontiers of Engineering Management 2019, Volume 6, Issue 3,   Pages 327-335 doi: 10.1007/s42524-019-0051-2

Abstract: The arrival of the high-speed rail (HSR) era has accelerated the pace of urban development, but its broad

Keywords: high-speed rail     nodal zone     interactive effects     sustainable urbanization     China    

Image-Aided Analysis of Ballast Particle Movement Along a High-Speed Railway Article

Xuecheng Bian, Wenqing Cai, Zheng Luo, Chuang Zhao, Yunmin Chen

Engineering 2023, Volume 27, Issue 8,   Pages 161-177 doi: 10.1016/j.eng.2022.08.006

Abstract:

As a core infrastructure of high-speed railways, ballast layers constituted by graded crushed stonestrain loads and greatly amplified and extended to the whole surface when the train speed reached 360vertical acceleration near the track center and horizontal acceleration at the track edge.related to the direction and distribution of ballast particle flow, which partly deteriorated under high-speedtrain loads.

Keywords: High-speed railway     Full-scale model test     Image-aided technique     Ballast particle movement     Track vibration    

Machine learning for fault diagnosis of high-speed train traction systems: A review

Frontiers of Engineering Management doi: 10.1007/s42524-023-0256-2

Abstract: High-speed trains (HSTs) have the advantages of comfort, efficiency, and convenience and have graduallyAs the core component of HST, the reliability of the traction system has a substantially influence onthe train.degrees of performance degradation and cause various failures, thus threatening the running safety of the trainFirst, the structure and function of the HST traction system are briefly introduced.

Keywords: high-speed train     traction systems     machine learning     fault diagnosis    

Value and governance of high-speed railway

Xiaoyan LIN, Zehua ZHANG, Meng WANG

Frontiers of Engineering Management 2017, Volume 4, Issue 4,   Pages 463-482 doi: 10.15302/J-FEM-2017054

Abstract: This paper considers multiple perspectives to explore the concept of high-speed railway (HSR), rationallyThis paper analyzes the governance potential of major countries in the high-speed railway value chainand studies the feasible ways and development strategies to enhance the high-speed railway governanceSecond, the high-speed railway standard output has become the core competitiveness that embodies high-speedThird, the global high-speed railway market presents a hierarchical high-speed railway governance model

Keywords: high-speed railway value     communication value     high-speed railway value governance     governance path upgrade    

A Train-Bridge Dynamic Interaction Analysis Method and Its Experimental Validation

Nan Zhang, Yuan Tian, He Xia

Engineering 2016, Volume 2, Issue 4,   Pages 528-536 doi: 10.1016/J.ENG.2016.04.012

Abstract:

The train-bridge dynamic interaction problem began with the development of railway technology, andIn the train-bridge dynamic interaction system proposed in this paper, the train vehicle model is establishedthe wheel/rail vertical and lateral interaction are simulated by the corresponding assumption and theThe train-bridge dynamic interaction system is solved by inter-history iteration.A case study of the dynamic response of a CRH380BL high-speed train running through a standard-design

Keywords: Train-bridge dynamic interaction     Wheel/rail relationship     Inter-history iteration     Field measurement     Experimental    

Title Author Date Type Operation

The key technology of testing and commissioning of high-speed railway and the main testing achievements

Kang Xiong and Yao Jianwei

Journal Article

Development of research on aerodynamics of high-speed rails in China

Tian Hongqi

Journal Article

High-speed train bogie technology research of coupled systems in high-speed trains

Zhao Minghua,Liang Shulin and Song Chunyuan

Journal Article

Model test of the group piles foundation of a high-speed railway bridge in mined-out area

Xin LIANG,Qian-gong CHENG,Jiu-jiang WU,Jian-ming CHEN

Journal Article

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Journal Article

Wheel/Rail Approach is the Inevitable Choice for Beijing - Shanghai High Speed Railway——Analysis of the

Jin Lüzhong

Journal Article

Study on dynamics of coupled systems in high-speed trains

Zhang Weihua

Journal Article

200 km Per Hour一The Best Choice for Beijing - Shanghai Express Railway

Li Yushan

Journal Article

The Construction of Beijing - Shanghai High Speed Railway

Shen Zhiyun,Qian Qingquan

Journal Article

Bridge engineering construction and technical innovation in the section between Beijing and Cangzhouin Beijing-Shanghai high-speed railway

Du Jiajun

Journal Article

Interactive effects of high-speed rail on nodal zones in a city: exploratory study on China

Guo LIU, Kunhui YE

Journal Article

Image-Aided Analysis of Ballast Particle Movement Along a High-Speed Railway

Xuecheng Bian, Wenqing Cai, Zheng Luo, Chuang Zhao, Yunmin Chen

Journal Article

Machine learning for fault diagnosis of high-speed train traction systems: A review

Journal Article

Value and governance of high-speed railway

Xiaoyan LIN, Zehua ZHANG, Meng WANG

Journal Article

A Train-Bridge Dynamic Interaction Analysis Method and Its Experimental Validation

Nan Zhang, Yuan Tian, He Xia

Journal Article